<label id="pz3vr"><optgroup id="pz3vr"></optgroup></label><span id="pz3vr"><output id="pz3vr"></output></span>
      <s id="pz3vr"><sub id="pz3vr"></sub></s>
      <s id="pz3vr"></s>
      <s id="pz3vr"></s>
    1. <label id="pz3vr"><sub id="pz3vr"></sub></label><ol id="pz3vr"><optgroup id="pz3vr"></optgroup></ol>
    2. <strike id="pz3vr"><input id="pz3vr"></input></strike>

      The production capacity of Zhuanlongwan coal mine of Ordos energy and Chemical Co., Ltd. has been expanded from 5.0mt/a to 8.0mt/a. The policy requires that coal preparation plants of the same scale must be equipped. In 2015, Shenzhou group built a 3.0mt/a dry process coal preparation plant. After separation, the calorific value of block clean coal increased by 1800kcal / kg and that of final clean coal increased by 1000kcal / kg. The project has the advantages of high product recovery rate, energy conservation and environmental protection.


      ITEM

      yield Wt%

      ASH Ad%

      Qnet,ar,Kcal/kg   NET CALORIFIC VALUE Qnet,ar,Kcal/kg

      RAW COAL

      100

      37.60

      3815

      LUMP CLEAN COAL

      20.90

      6.30

      5691

      FINE CLEAN COAL

      48.60

      18.94

      4887

      REJECT

      30.50

      88.78

      821

      ORDOS ENERGY AND CHEMICAL CO.,LTD OF YANZHOU COAL INDUSTRY

      TIME: 2022-03-07
      FOLLOW WITH OUR WECHAT,?
      TO KNOW MORE ABOUT SHENZHOU GROUP.

      PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

      ONLINE MESSAGE

      一级全黄视频,一级待一黄aaa大片在线还看,毛片无遮挡高清免费观看,亚洲字幕 麻阳| 永州市| 香格里拉县| 上虞市| 开封县| 县级市| 赞皇县| 汉沽区| 巴马| 开远市| 湖州市| 保亭| 铅山县| 德令哈市| 大洼县| 彭州市| 固阳县| 武宣县| 贵阳市| 时尚| 保定市| 临城县| 黔西| 延安市| 孟连| 德钦县| 雷山县| 称多县| 剑阁县| 信阳市| 济宁市| 文登市| 福清市| 佳木斯市| 苏尼特右旗| 财经| 商城县| 裕民县| 仲巴县| 新闻| 青田县| http://444 http://444 http://444 http://444 http://444 http://444